Case Study - Ysgol Y Creuddyn 4G Floodlighting Installation
- Jul 16
- 2 min read
Updated: Jul 18
SJB Floodlighting was appointed to deliver the specialist floodlighting installation for the new 4G Artificial Grass Pitch (AGP) at Ysgol Y Creuddyn, Llandudno. The project formed part of a wider sports facility development that included the construction of a FIFA Quality standard football pitch, changing facilities and associated infrastructure. The floodlighting installation was designed to provide a professional-standard playing environment while meeting stringent planning, environmental and sporting requirements.
The Challenge
The project required a lighting solution capable of:
Achieving a maintained illumination level of 250 lux with a minimum 0.6 uniformity ratio suitable for competitive football.
Minimising glare and obtrusive light to neighbouring properties.
Complying with:
FIFA Class II lighting requirements
BS EN 12193 Sports Lighting
FAW Tier 3 Club Licensing Regulations
ILP Guidance Notes for the Reduction of Obtrusive Light.
The installation also needed to integrate with works being carried out by multiple contractors on a live school site, requiring careful planning, coordination and strict health and safety procedures.
SJB Floodlighting Solution
SJB designed and supplied a complete LED floodlighting system incorporating:
Six 14-metre base-hinged Christy lighting columns.
Twelve Gigatera flat-glass ultra-low glare LED floodlights.
Weatherproof feeder pillar housing the local switchgear.
Integrated time clock to satisfy planning conditions.
Remote wireless lighting control.
The base-hinged column system was selected to provide safe future maintenance while delivering excellent long-term reliability.
Scope of Works
The project included:
Pre-construction planning and mobilisation
Supply of specialist LED sports lighting equipment
Delivery of columns and floodlights
Installation of all lighting columns
Installation of feeder pillar and electrical switchgear
Cable installation to each lighting column
Testing and commissioning
Recording of lighting performance
Production of operation and maintenance documentation.
Engineering Excellence
Every aspect of the installation was designed to meet demanding sports lighting standards.
Following installation SJB:
Tested the electrical installation in accordance with BS7671
Measured and verified illumination levels
Fine-tuned floodlight aiming where necessary
Produced drawings and commissioning documentation
Delivered operational training for the client.
Safety & Quality
As with every SJB project, quality and safety were central to delivery.
The installation was completed by:
NICEIC Approved Contractors
CHAS Accredited operatives
SafeContractor Approved teams
JIB registered electricians
18th Edition qualified engineers
DBS-checked personnel for working within school environments.
The Result
The completed installation provides:
Professional-quality LED sports lighting
Uniform illumination across the entire playing surface
Reduced energy consumption through modern LED technology
Low glare for players, spectators and nearby residents
Reliable switching and electrical protection
A safe, high-quality facility capable of supporting football throughout the year.
The new floodlighting system enables Ysgol Y Creuddyn to maximise pitch usage during evenings and throughout the winter months, creating a valuable sporting asset for both the school and wider community.